Pacific Mistral

The Pacific Mistral recently completed its customer-requested upgrades and modifications and commenced operations in Brazil on Feb. 6, 2012, under a three-year contract with Petrobras.

Pacific Mistral

  • Samsung 10000 design capable for operations in 12,000 feet water depth
  • Equipped for 35,000 feet drilling depth
  • Maximum 37,500 feet drilling depth
  • 200-man accommodation
  • 20,000 MT Variable Deck Load
  • Enhanced single activity with offline stand-building
  • Four HP pumps 7,500psi
  • 15,500 bbls liquid mud storage
  • Increased thruster capacity and hull-strengthening to expand operating envelope
  • Outfitted with multipurpose lowering cart for X-tree hang off
Download Detailed Specs  