Pacific Santa Ana

The Pacific Santa Ana commenced its five-year contract with a Chevron subsidiary on March 21, 2012, and began operations in the U.S. Gulf of Mexico on May 4, 2012.

Pacific Santa Ana

  • Samsung 12000 design capable of operating in 12,000 feet water depth
  • Equipped for 35,000 feet drilling depth
  • Maximum 40,000 feet drilling depth
  • 200-man accommodation
  • 20,000 MT Variable Deck Load
  • Dual derrick with twin 1000ST load paths
  • Main rotary 75.5”, Auxiliary rotary 60.5”
  • Enhanced mud and solids handling
  • 19,000 bbls liquid mud storage
  • Six HP pumps 7,500psi
  • Dual gradient drilling capable
Download Detailed Specs 
View our Fleet Status +
Operations