Pacific Scirocco

The Pacific Scirocco commenced operations in Nigeria on Dec. 31, 2011, under a two-year contract with a Total subsidiary.  On April 6, 2012, Total exercised an option to extend the contract to January 2014.  On April 7, 2013, Total exercised an additional one-year option to extend the contract term until January 2015.   

Pacific Scirocco

  • Samsung 12000 design capable of operating in 12,000 feet water depth
  • Equipped for 35,000 feet drilling depth
  • Maximum 40,000 feet drilling depth
  • 200-man accommodation
  • 20,000 MT Variable Deck Load
  • Dual derrick with twin 1000ST load paths
  • Main rotary 75.5”, Auxiliary rotary 60.5”
  • Enhanced mud and solids handling
  • 19,000 bbls liquid mud storage
  • Four HP pumps 7,500psi